Police Rehabilitation Centre Pool Facility Refurbishment

Following the successful completion of the Gym refurbishment at the Police Rehabilitation Centre in April 2019, BAP were appointed for the refurbishment of the Centre’s Pool and Hydrotherapy facilities.

The brief was to enlarge and improve the hydrotherapy pool, the changing facilities and the main exercise pool. The hydrotherapy pool was significantly enlarged requiring major structural works and the design included a stepped profile and hydro jets to assist the Centre’s physiotherapy treatments. The lighting, ventilation and pool supply equipment was redesigned and replaced along with extensive refurbishment of the pool finishes. The result is a modern bright and up to date hydrotherapy and pool facility.

Works were completed in October 2020 and featured in the Clients news article for their ‘Jewel in the Crown’

NEWS

Police Rehabilitation Centre Pool Facility Refurbishment

Following the successful completion of the Gym refurbishment at the Police Rehabilitation Centre in April 2019, BAP were appointed for the refurbishment of the Centre’s Pool and Hydrotherapy facilities.

The brief was to enlarge and improve the hydrotherapy pool, the changing facilities and the main exercise pool. The hydrotherapy pool was significantly enlarged requiring major structural works and the design included a stepped profile and hydro jets to assist the Centre’s physiotherapy treatments. The lighting, ventilation and pool supply equipment was redesigned and replaced along with extensive refurbishment of the pool finishes. The result is a modern bright and up to date hydrotherapy and pool facility.

Works were completed in October 2020 and featured in the Clients news article for their ‘Jewel in the Crown’

Bickerdike Allen Partners
121 Salusbury Road
London NW6 6RG
T 020 7625 4411
mail@bickerdikeallen.com