BAP are pleased to announce the completion of our latest cladding project for a 12-storey residential building in northwest London. The works involved stripping the existing aluminium and terracotta rainscreen cladding systems back to the subframe and installing new non-combustible rainscreen cladding systems to match the appearance of the existing. The external terrace and balcony floor build-ups were also replaced, and glass balustrades were replaced with new aluminium cladding and railings. The works were carried out while the building remained fully occupied. BAP provided the Stage 4 design and undertook site inspections as the lead consultant during the cladding installation.