Alban City School Lecture Theatre

The refurbishment of Alban City School’s lecture theatre has started on site. The works include the complete strip out and subsequent installation of new floors, finishes and ceilings, together with new seating and stage with integrated audio-visual equipment.

The School intend to use the new space for assemblies and pupils performances as well as hiring out the venue for external events.

BAP, as lead consultant, have designed and managed the project from RIBA stage 0-5. The programme is expected to take 8 weeks and will be completed before the end of September.

Before 

After

NEWS

Alban City School Lecture Theatre

The refurbishment of Alban City School’s lecture theatre has started on site. The works include the complete strip out and subsequent installation of new floors, finishes and ceilings, together with new seating and stage with integrated audio-visual equipment.

The School intend to use the new space for assemblies and pupils performances as well as hiring out the venue for external events.

BAP, as lead consultant, have designed and managed the project from RIBA stage 0-5. The programme is expected to take 8 weeks and will be completed before the end of September.

Before 

After

Bickerdike Allen Partners
121 Salusbury Road
London NW6 6RG
T 020 7625 4411
mail@bickerdikeallen.com