Technology

Museum of Liverpool

The new amphitheatre steps and terraces works were completed at The Museum of Liverpool last summer.

New purpose made re-constituted stone steps and terraces sections were formed to create the new space. A complex steel support system was designed which bolted to concrete slab structure.

The project was completed in challenging weather conditions while the museum remained fully open to the public.

Bickerdike Allen Partners
121 Salusbury Road
London NW6 6RG
T 020 7625 4411
mail@bickerdikeallen.com